所填土的压实分为人工夯实和机械压实两中,对不同的方法有不同的施工要求。
By filling the compacted into manual and mechanical compaction consolidating the two, for different construction methods have different requirements.
所填土的压实分为人工夯实和机械压实两中。
By filling the compacted into artificial consolidate and mechanical compaction of the two.
填土路基分段作业时,先施工路段端部必须留不陡于1:5的坡面,坡面必须整平压实,以便施工机械上下及下段路基施工时开台阶。
When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.
应用推荐