排水沟末端设置一个滤水沉淀池,现场施工用水及雨水经沉淀池沉淀过滤后排入化工区河浜内。
The filter settlement tank to be built at end of ditch. The construction water and storm water is discharged to the creek in chemical industrial zone after settlement.
气体中所含的大部分灰渣由于惯性作用,通过下降管底部的末端出口沉入液池。
A large majority of ash slag contained in the gas sinks to the liquid tank through an outlet at the tail end on the bottom of the downcomer due to the inertia action.
应用推荐