晴天工作日(Weather Working Days),又称“良好天气工作日”,是航次租船运输合同中计算装卸时间的术语。
由于缺少晴天工作日,建筑工程陷于停顿。
Building work has held up by the lack of weather working days.
由于缺少晴天工作日,建筑工程陷于停顿。
Building work was held up by the lack of weather working days.
据我所知,大多数欧洲港口每个舱口每个晴天工作日的平均装船率为250吨。
To my know ledge, most of the European port have an average loading rate of 250 ton per hatch per weather work day.
应用推荐