这个系统的项目需要一个明确的线路图和时间表。
This systematic project calls for a clear road map and timetable.
发展长江经济带是一项系统工程,需要有明确的路线图和时间表。
Developing the Yangtze River Economic Belt is a systematic project which calls for a clear road map and timetable.
本周的盖洛普民意调查发现60%的美国人支持2008年末从伊拉克撤军的明确的时间表。
A Gallup poll this week found that 60% of Americans favour a firm timetable to withdraw troops from Iraq by late 2008.
应用推荐