时间定额是指在正常和合理使用机械的条件下,完成单位合格产品所必须的工作时间,时间定额以台班为单位,1台班相当于1台机械工作8小时的劳动量。产量定额是指在正常和合理使用机械的条件下,在单位台班内完成合格产品的数量标准。因此,产量定额与时间定额是互为倒数的关系。
修理停歇时间定额 downtime quota for equipment repair
设备管理停歇时间定额 Downtime quota for equipment repair
时间定额标准 time quota standard
长时间额定值 Longtime rating
实验表明,只要选择适当的样本,并在系统中不断进行自学习与自组织,就能快速获得准确的工序时间定额。
The experiments show that precise process time-quota can be obtained rapidly with proper samples selected, continuous self-study and self-organization in system.
为此,介绍一种应用多元线性回归方法制定时间定额的基本原理和具体作法,供从事劳动定额管理工作的同志参考。
Thus, the basic principle and specific procedure for the making regression method is described. It can provide as a reference for the manager engaged in the work quota management.