新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
根据关键路径法和串行调度原理,论述了先序活动和后序活动时间参数计算的方法,并以实例阐述了计算原理。
According to critical path method and serial scheduling, a schema was discussed for computing time parameters of transitive predecessors and transitive successors.
基于对搭接网络计划的分析,给出一组一般网络计划、搭接网络计划和流水网络计划的通用时间参数计算模型。
In this paper, a set of unified calculating models for general network planning, spliced network planning and streamlined network planning based on analysis of the spliced network planning.