So, new tunnel monitor and control system and old ones need a safer and better efficiency resolution. Fieldbus is a good replacement.
现在,新建隧道的监控系统以及旧监控系统的改造需要一种更安全、更可靠、更高效的解决方案,融合现场总线技术的隧道监控系统方案,是一种很好的途径。
参考来源 - 基于PROFIBUS现场总线的隧道监控系统·2,447,543篇论文数据,部分数据来源于NoteExpress
新建隧道从既有公路隧道上方穿过,在空间上形成交叉隧道。
最后,采用数值模拟的方法分析了新建隧道的施工对邻近建筑物的时间相关性影响。
Finally, the time dependence influence of the new tunnel's construction to adjacent building was analyzed by numerical simulation method.
针对城市地铁新建隧道近接既有民房桩基的工程情况,进行了三维有限元数值模拟的施工力学行为研究。
In this paper, the mechanical behaviour of a shield tunnel construction in urban metro adjacent to existing pile foundation is studied by using 3d FEM ANASYS numerical simulation method.
应用推荐