文章介绍了回采工作面的调斜方法。
This paper introduces the method of slope adjustment of stope face.
提出了斜拉桥调索计算的斜拉索虚拟温度荷载法,给出了该方法的计算流程和迭代表达式。
Virtual temperature load method to adjusting the tension force in the cable is proposed, and its computing procedure and iteration expression are given.
通过对综采工作面调斜回采的总结分析,为综采工作面减少搬家次数及转采提供了借鉴经验。
The slope adjustment mining are analyzed. The production experience of reducing frequency of fully mechanized mining coal work-face removing is provided.
应用推荐