介绍了高炉炉顶余压透平发电装置(T RT)的工艺流程和控制系统配置。
The technique and control system of the Top Pressure Recovery Turbine Unit (TRT) system are introduced.
分析了纺丝侧吹风空调机组及送回风系统设计及其自动控制系统配置的节能措施。
The energy saving measures for cross air blow conditioner system were analyzed from the aspects of return air system design and automatic control system configuration.
艾默生还负责所有产品和系统,控制系统配置,培训及其它现场服务的最终验收测试。
Emerson was also responsible for final acceptance testing of all products and systems, control system configuration, training, and other on-site services.
应用推荐