这是最低价了。我们是按成本销售。
物业、机器及设备按成本值减累积折旧及减值损失入账。
Properties, machinery and equipment are stated at COST less accumulated depreciation and any impairment losses.
经营租约下的预付租金最初按成本列帐,其后按租期以直线法确认。
Prepaid land lease payments under operating leases are initially stated at cost and subsequently recognised on the straight-line basis over the lease terms.
She costs C for sure, that's a wash because B, the way we've worked things out, B was $2, C was $1, So B/2-C is a wash.
她承担C的成本,收益是零,因为B,按我们设定的金额,B是2美元,C是1美元,所以B/2-C是零
应用推荐