本文结合工程实践,通过现场试验分析研究提出锚杆桩抗拔极限荷载直接或间接的确定方法,并提出了合理的施工方案。
The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.
如何利用现场抗拔静载试验中未达到破坏的工程试桩数据来确定其抗拔极限承载力是一个重要的工程问题。
It is very important for engineer to determine the uplift ultimate bearing capacity by using the data of non-destructive test of pile.
以新疆地区某高压输电线冻土桩基础受力分析为背景,在人工冻结条件下,进行了单桩的室内抗拔模型试验。
Aimed at the pile foundation in frozen soil of a high voltage transmission line project in Xinjiang Region, a laboratory tensile model test is carried out under artificial frozen condition.