而且,在平台打桩工程建设中出现了诸如拒锤、溜桩等等的实际问题。
It is one of pile driving to predict more accurately driveability analysis.
至于撞击式打桩工程,则禁止在限制时间内施工;即使在日间进行,也须领有许可证。
Percussive piling work is prohibited during the restricted hours and requires a permit even during daytime.
如须于核准时间内进行撞击式打桩工程,必须事先取得由环保署签发的建筑噪音许可证。
A valid Construction Noise permit issued by the Environmental Protection Department is required for the carrying out of percussive piling during the permitted hours.
应用推荐