l 如果选择弧长控制(Arc-length Control): 只允许有一个用户定义的解算点,该点定义结构的参考载荷,并且假定在整 个分析过程为比例加载。
基于8个网页-相关网页
This paper analyzes how welding conditions tamper with welding process and welding quality, and the united control strategy of arc length control, by using changeable wire speed and drop-characteristic welding power source, is presented based on this analysis.
本文分析了MIG焊接工艺参数对焊接过程及焊接质量的影响,并基于此提出了采用变速送丝配合缓降特性焊接电源的焊接弧长控制策略。
参考来源 - 基于DSP的MIG焊弧长模糊控制的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
应该试一下非线性分析,可能要用弧长控制法。
You should try a Nonlinear analysis, possibly with Arc length control method.
结构后屈曲分析传统上都是采用弧长控制法来处理。
Post buckling analysis was traditionally conducted by arc length method.
鉴于焊接弧长控制系统通常为复杂的非线性系统,本文将模糊控制理论引入弧长控制过程中。
The fuzzy control theory is inducted to the control as the control system is a complicated nonlinear one.
应用推荐