该方法在引进装置的改扩建设计中得到了应用。
And this method was applied to the revamping design of some introduced plants.
本研究工作为稳定引进装置硫磺回收率作了有益的探索。
This work has offered a useful exploration in stabilizing the sulfur recovery rate of imported unit.
同时介绍了引进装置的运行情况和对引进技术的消化、吸收、改进经验。
At same time, the commissioning and production of device are described, some experience of digestion, absorption and improvement are included.
应用推荐