希望你们在 开箱检查前一个月,将 开箱检查日期通知我们。
Please inform us of the date of inspection one month before the open - package inspection.
包括:1、安装前的准备;2、设备的开箱检查和验收,各设备基础的检查和校正;3、各主要设备和辅助设备的就位;4、锅炉烟道系统的制作及安装。
Including: 1, Before installation: 2 the open-package inspection and acceptance of the equipment, the inspection and calibration equipment foundation, 3 the main equipment and auxiliary equipment 4.
开箱后检查设备并按装箱清单清点附件及随机文件(见下表)。
Check the device, accessories and document with the device as per list of packing (See the table below).
应用推荐