象山港大桥的迅速开工反映了这么多年周到的准备工作,至上而下异议不多的行政管理,以及大量的项目资源。
The swift start on the Xiangshan Island Bridge project reflects years of preparatory work, a top-down administration that tolerates little dissent and a pipeline of projects.
安装工程开工前的技术准备工作非常重要,它是保证工程进度、工程质量、降低工程成本、搞好现场HSE管理的先决条件。
Technical preparation work is very important, and it is a precondition of ensuring project progress and quality, decreasing project cost and offering good field HSE management.
笔者以为要从开工前的准备工作、开工后的基础工作和项目安全文化建设几方面来着手。
The author thought must after the operation preparatory work, the operation foundation work and project security cultural reconstruction several aspects begins.
应用推荐