现在要求您(作为全职员工或咨询师)对过度膨胀的数据中心进行检查,在合理的延迟时间内解决问题并创建增长计划。
You've been brought in, either as a full-time employee or as a consultant, to rein in the overgrown data center, solve problems with application delays, and create a plan for growth.
6年前,葡萄牙与GSC签署了合同,采购两艘U - 214潜艇,总价为7.7亿欧元(10亿美元),因为交付的延迟,这一成本继续增长。
Portugal signed a contract with GSC six years ago for two U-214 submarines for 770 million euros (1.0 billion dollars), a sum that has increased due to delays.
不过,对于上述的“可增长线程池”,此解决方案并不是十全十美:在AIO工具中排队会带来额外的开销和延迟。
However, as in the case of "growable thread pools" above, this solution is not perfect: queuing in the AIO facility introduces additional overhead and latency.
应用推荐