电缆路径的选择应符合设计要求;
The selection of cable line shall conform to the design requirements.
输水管道工程回填土压实度应符合设计要求。
The compact density of backfill earth in water transportation pipeline construction has to meet the requirements in design stage.
安装分包商在工程中所用设备、应符合设计要求及现行标准。
The equipments, material applied by installation subcontractor in construction shall conform to the designing requirements and current national specification.
应用推荐