因此,在用地脚螺栓将混凝土基础与塔机底架法兰盘拉紧后,由于基础不平,4个法兰盘不可能在同一平面上。
Therefore, in the concrete foundation with anchor bolts and tighten the flange crane chassis, because the foundation is uneven, 4 flange may not be in the same plane.
放活动装置的底架平面,应出去灰尘等物以免机器遇到不能破碎的物料时活动轴承不能在底架上移动,以致发生严重事故;
A plane 5, active device, should go out dust to machine broken material cannot meet the movable bearing cannot move on the chassis, resulting in serious accidents;
节能球磨机改变了原有的磨机结构,是机体、底架一体化,安装时可一次性吊放在基础平面上。
This machine changes the intrinsic grinding machine structure Its body and ground plank are an integral whole . So when fixing . it can be located on a plane surface only once.
应用推荐