指出这种优化方法尽管可实现工期最短,但无法保证资源分布的最优效果。
It points out that this method may meet the shortest time limit but could not ensure the optimum resource distribution.
本文研究了资源有限—工期最短的优化问题,提出了相应的分枝定界算法。
In this pater, the problem of limited resources and shortest time limit for a project is studied and an algorithm of branch and bound method for this problem is proposed.
通过三大目标的控制,要力争使所建项目达到建设工期最短、成本最低、工程质量最高的目的。
Through three major objectives control, it can make an effort for a purpose of the most short time, the lowest cost and the best quality.