讨论了工件准备时间、加工时间和交货期都为随机变量的单机调度问题。
This paper is concerned with single machine stochastic scheduling problems with random ready times, processing times and due dates to minimize the number of tardy jobs.
它包括初始设计模块,基本设计,船体建模,船舶配件模块,装配计划和工件准备模块。
It includes initial design modules, basic design, hull modeling, outfitting modeling modules, assembly planing and work preparation modules.
在知识管理阶段,当在回归库中编制了测试工件之后,就准备好将它们自动化。
After test artifacts have been documented in the regression library during the knowledge management phase, they are ready to be automated.
应用推荐