给出了对铀尾矿堆或建筑材料的部分测量结果。
Some monitoring results on uranium mill tailings piles and building materials are presented.
尾砂坝坝满后应及时进行尾矿堆坝、堆坝坡度应按设计图纸放线施工。
Once the dam is full, it shall be piled up, the grade of the piled slope shall be in accordance with the design drawings and constructed accordingly.
尾矿固结排放工艺流程主要包括泵砂、添加胶凝材料、尾矿脱水和脱水后尾矿堆排。
The cementation of tailings mainly includes the process of pumping sand, adding cementation material, tailings' dehydrating, and piling after dehydration.
应用推荐