在生产负载中,必须计划好有足够的容量来应付尖峰负载,而不是平均的稳定状态。
In production, you must plan to have enough capacity for your peak loads, not the average steady state.
峰荷机组装机容量的确定直接影响到峰荷时段的电价尖峰水平和供电可靠性等问题。
The capacity of peak load unit directly affects peak electricity price level and reliability of power supply during peak load period.
应用推荐