第二条(北面)跑道合约和客运大楼西北客运廊扩展部分的主要建造合约,已分别于四月和九月批出。
Contracts for the second (or northern) runway and for the main building contract for the extension to the passenger terminal north-west concourse were awarded in April and September respectively.
本文采用模型实验和计算机数值计算相结合的方法,对客运大楼、中庭火灾烟气流动及其影响因素进行了研究。
This thesis adopts the method which combines model experiment with computer numerical calculations and studies the smoke flow in terminal halls and atria and the affecting factors.
在项目沿线的德黑兰、库姆与伊斯法罕客运站大楼内设置电气与机械控制系统。
The electrical and mechanical control system is set in tehran qom esfahan passenger station buildings along the line of this project.
应用推荐