通过完井测试获得裸眼段测井以及水泥环测试资料。
Open hole logs and a cement-bond log were obtained to build a completion-adviser log.
库1井直井段在完井测试期间, 2次测试井下封隔器均被埋死,造成非常严重的井下事故。
During the completion well testing period of the vertical well section of Ku 1, we tested 2 times and the downhole packer was all imbedded, result in very serious downhole accident.
应用推荐