介绍了多沙河流游荡性河段整治工程措施试验研究课题中浑水系统的研制过程。
The development procedure of the muddy water system is introduced in the test study of the braided reach realignment engineering measure odf multi-sand river.
通过系列河工水槽试验,应用新型钢筋混凝土四面体透水框架,进行多沙河流游荡型河道整治试验研究。
Through series river model test, Use new steel concrete permeable tetrahedron frame, to do river regulation experimental study in sediment-laden river wandering channel.
应用推荐