黄壁庄水库副坝防渗心墙加固工程所需高性能混凝土,要求和易性好、早期强度低、后期强度高、抗渗性能好、低弹模和高抗拉强度。
The high performance concrete for core wall of earth dam must be good workability, low early strength, high final strength, high seepage resistance, low elasticity modulus and high tensile strength.
结合工程实践,介绍了小钢模拼装成大模板用于短肢剪力墙的施工方法。
Based on actual engineering, construction method of large steel formwork for short shear wall is introduced in this paper, which is assembled by small steel formwork.
振动沉模防渗板墙技术是近几年引入水利工程中进行地基防渗加固的一种新技术。
In recent years, the vibration sinking mould cutoff panel wall is introduced to the hydro project, which is the new technology to strengthen the foundation anti-seepage.
应用推荐