研究成果为探索更有效的加固深厚吹填土方法提供了依据。
The study provides a basis for exploring a more effective method to reinforce deeply reclaimed soil.
填方的顺序一般是先填石方在填土方,先填底土后填表土,先填进土后填远土。
Fill the order is generally the first to fill in the rock fill, fill subsoil after filling soil, fill into the soil after filling soil far.
建筑立面特征还包括在屋顶上800毫米填土方覆盖的XPS保温层和清水现浇混凝土外墙之间的夹心保温层。
The building envelope also features 800mm earth fill over XPS insulation on the roof and sandwich-type insulation between fair-faced in-situ concrete external walls.
应用推荐