土壤:调查和试验。经水凝粘合剂处理的、可能混有石灰的、用作所选填土的土壤。第1部分:定义。组分。分类。
Soils: investigation and testing - Soil treated with hydraulic binder, possibly combined with lime, for use as a selected fill - Part 1: definition - Composition - Classification.
先行走后固定塔吊应立于轨道上,如后固定位置处于回填土上时,其基础作特殊处理,必须满足承载要求。
To walk after fixed tower crane should remain on track, such as fixed position in backfill soil, the foundation for special treatment, must meet the load requirements.
土壤:调查和试验。经水凝粘合剂处理的、可能混有石灰的、用作所选填土的土壤。第2部分:实验室配方研究的方法。
Soils: investigation and testing - Soil treated with hydraulic binder, possibly combined with lime, for use as a selected fill - Part 2: methodology of laboratory formulation studies.
应用推荐