观音阁水库底孔坝段采用碾压混凝土尚属国内首例。
Roller crushed concrete is adopted first within our country in DAMS with bottom conduits in Guanyinge reservoir.
左导墙位于泄洪坝段与左厂房坝段之间的导墙坝段下游。
The left training wall of TGP is situated downstream of the transition dam section between spillway and left intake dam.
铜街子水电站在复杂的地质条件下,对河床坝段进行了全面高压固结灌浆。
The complete high pressure consolidation grouting was carried out in dam section of riverbed of Tongjiezi project under, complicated geological conditions.
应用推荐