某高层建筑已完成污水处理装置土建部分的施工,为达标排放,提出改造方案。
In order to achieve discharge standard of the constructed wastewater treatment equipment in certain highrise building, the plan for reconstruction is provided.
地块目前为地铁一号线深大站的施工工地,地铁土建部分和土方回填已经施工完成。深大站于2009年9月底投入运营。
The site is now construction site of Shenzhen University station, which has been finished, and the station has started its operation at the end of September, 2009.
这栋混凝土建筑的屋顶由矿石建成并覆有植被,它从斜坡上升起,好似建筑场地的扩建部分。
The mineral and vegetated roof of this concrete structure rises up from the slope as though it were an extension of the grounds.
应用推荐