对大型塔架吊装全过程进行几何及力学分析,并编制相应的计算机软件。
An analysis, geometrically and mechanically, is made on the whole hoisting process of large-scale tower frames; and the corresponding computer software is programmed.
吊装式导管架和整体吊装甲板显著地简化了平台的海上安装并且大量地减轻了结构质量。
The lifting type jacket and integrated deck structure have significantly simplified offshore installation of the platform and greatly reduced the weight of the structure.
结合瀑布沟大桥工程实际,详细介绍了无塔架缆索吊机的设计方法和无塔架缆索吊装预制横梁及吊杆的安装技术。
Based on the practice of Pubugou Large Bridge, the technology of non-tower cable lifting prefabricated transverse beam and rod installation is introduced in detail.
应用推荐