... 合同通用条件 general conditions of contract 合同专用条件 special conditions of contract 工程量清单 bill of quantities, BOQ ...
基于32个网页-相关网页
如果要求工程师在行使其规定权力之前需获得雇主的批准,则此类要求应与合同专用条件中注明。
If the Engineer is required to obtain the approval of the Employer before exercising a specified authority, the requirements shall be as stated in the Particular Conditions.
第十六条 根据情况需要,如经双方同意委托人将可以自费向监理人提供其他人员, 应在合同专用条件中予以反映。
Article 30 If the claim made by the Client to the Supervisor cannot be justified, the Client shall be responsible for any cost incurred by the Supervisor in relation to the claim .
本工程量清单应连同投标人须知、合同的通用和专用条件、技术规范以及图纸一并进行阅读。
The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and Special Conditions of Contract, Technical Specifications, and Drawings.
应用推荐