经过反复论证,2004年在冷床输入辊道的入口处增加了一台提速拨板装置,将轧件头尾分开,解决了这个难题,产能得到了释放。
A increasing speed acting unit was added by Author at the cooling bed entrance in 2004, in order to separate head from tail. The bar production was increased much because of solving this big problem.
所述升降装置固定台与传送辊道之间设置有传送辊道升降装置。
A conveyance roller way lifting device is arranged between the lifting device mounting plate and the conveyance roller way.
应用推荐