... AF Actual Finish Date 实际完成日期 AOA Activity-On-Arrow 双代号 网络图 AON Activity-On-Node 节点号网络图 ...
基于1个网页-相关网页
双代号网络图 activity-on-arrow ; AOA ; Arrow Diagramming Method ; double code network diagram
双代号网络图法 Activity-On-Arrow ; Active On the Arrow ; AOA
双代号绘图法 arrow diagramming method ; ADM
最常见的有双代号网络 activity-on-arrow network ; AOA
双代号网络 twin code name network
也叫双代号网络图 Active On the Arrow ; AOA
又叫作双代号网络图法 Active on the Arrow ; AOA
见的有双代号收集 activity-on-arrownetwork ; AOA
我们以双代号绘图法 Arrow Diagramming Method
提出了一种简化的确定关键路径方法,该方法可分别运用于单代号和双代号网络图中。
This paper put forward a simplified method that can be used on activity on node network and activity on line network to identify the critical path of schedule.
将双代号网络计划放在时间坐标里,编制成“时标网络”,使网络图的识读变得容易。
The 'time scale network' was worked out by building the dual-code network plan into the time coordinate, which can make the network graph more readable.
本文介绍了网络计划技术的概念,阐述了双代号网络计划图和单代号网络计划图的特点。
In this paper, the concepts of network planning techniques is introduced at the beginning. The characteristics of dual code and single code network drawing is expounded.