同时,在将单元从版本5升级到版本6之前,工作区将通过创建额外的节点和服务器来规划发送移植的容量。
In the meantime, the workaround is to preplan the post-migration capacity by creating additional nodes and servers prior to upgrading the cell from V5 to V6.
通过对该电机定子温度场计算结果的后处理,得出了该电机定子运行在不同时间段里的温度分布图,以及该电机定子壳体任一节点的温升曲线。
Dealing with the calculation results of the temperature field of the motor stator, we obtain the temperature distributed diagram at not same segment, and the temperature rising the curve of any node.
根据螺杆泵举升系统的工作特点,以螺杆泵为函数节点,提出了工艺设计方法。
Grounding on the working characteristics of PCP lifting system, the pump can be considered as a functional nodal, and the way of technological design is brought forward.
应用推荐