工作项目会依照状态、分级、顺位、优先权、反覆项目和区域排序。
Work items are sorted by state, triage, rank, priority, iteration, and area.
页面中心区域通常由列表或受限列表组件构成,提供各种方法排序或显示数据记录。
The central area of the page is usually composed with a list or constrained list component, offering a variety of methods of sorting or displaying the list of data records.
泄漏疑点按区域大小排序,最重要的泄漏疑点显示在最顶端。
The leak suspects are sorted by their reach size, with the most significant leak suspect shown at the top.
应用推荐