该系统已经在北仑发电厂2号机组投入运行,有效指导机组启停,达到了优化运行的目的。
The system has been put into use on the No. 2 unit of Beilun Power Plant. It can effectively direct the practical start-stop operations which meets the purpose of operational optimization.
分析了北仑发电厂600 M W 锅炉再热器局部超温及旁路改造未能达到预期效果的原因;
The causes for local overtemperature of high temperature reheater of 600 MW boiler in Beilun Power Plant and that bypass retrofit could not realize the expected effect are analyzed;
应用推荐