并列过程有助于确保,最有价值的剩余结构将在下一步得以创建,并且它强调工作总是在可传递的地方完成。
The Scrum process helps ensure that the most valuable remaining features are built next, and it emphasizes that work always be completed to the point of being deliverable.
结构抗连续倒塌设计方法的关键是确定因偶然作用导致局部构件失效后剩余结构的连续倒塌抗力需求。
The key issue of progressive collapse (PC) design method is to determine the PC resistance demand of the structures with members removed due to accidental action.
摘要 :结构抗连续倒塌设计方法的关键是确定因偶然作用导致局部构件失效后剩余结构的连续倒塌抗力需求。
Abstract :The key issue of progressive collapse (PC) design method is to determine the PC resistance demand of the structures with members removed due to accidental action.
应用推荐