... lightguide fabrication 光波导制造 fabrication sequence 制造顺序 fabrication cost 建造费 ; 建造费用 ...
基于116个网页-相关网页
采用准时制按顺序制造 Just In Time For Sequence
制造车间作业计划就是确定工件的加工顺序,确定机器加工每个工件的开始时间和完成时间。
The job planning in a manufacturing workshop is to fix on the machining sequence, the starting time and finishing time for each part.
可重构制造系统的设计目标是要确定各种零件的生产周期、各种零件之间的生产顺序与加工各种零件所用的组态。
The design objective of reconfigurable manufacturing systems (RMS) is to decide the production period, the sequence and the configuration for machining each member of a part family.
在执行制造工艺顺序子集期间,改变用于创建某种结构的材料、单元工艺、和工艺顺序。
During the execution of the subset of the manufacturing process sequence, the materials, unit processes, and process sequence for creating a certain structure is varied.