在合流制排水系统中,排水泵站中设置调蓄池是解决城市初期雨水对水体污染的有效措施。
In order to solve the problem of pollution in confluence drainage system, which is caused by initial rainwater, setting storage pond under the drainage pumping station is a effective measure.
为此,重点研究了上海中心城区某合流制排水区域JXB系统雨天污染物溢流的出流过程和污染物的事件平均浓度,并探讨了溢流污染物的初期效应。
The process of pollutant overflow from the JXB sewer system and the event mean concentrations(EMCs) of overflows in Shanghai were studied, and the first flush effects were discussed.
应用推荐