针对这一情况,从药室爆破放顶充填采空区,从而达到分层崩落法采矿的护顶层要求。
Based on this case, through filling the gob area by means of chamber blasting, the requirement of protective top - layer for slicing and caving can be achieved.
对于金属矿的开采,一般认为分层崩落法与其他采矿法相比,是一种成本高、产量低、木材消耗量大的采矿方法。
Generally top slicing is a mining method of high cost, low productivity, and large consumption of timber as compared with other methods for mining metalliferous ore bodies.
应用推荐