交货状态为:热轧,控轧,正火。经供需方协议加做探伤。
Delivery state: hot rolling, controlled rolling, normalizing. After the agreement for doing inspection.
总之,计划应在不断变化的环境下较高并灵活的安排生产进度表、监督、及更新交货状态。
Focus is be able to maintain a highly flexible production schedule and watch and update delivery statues in a continuously changing environment.
交货状态:以热轧或冷拉状态交货,交货状态应在合同中注明,每批货都对炉号和材质进行描述。
Delivery status: hot or cold to pull state delivery, delivery status should be indicated in the contract, each shipment of the furnace, and the material is described.
应用推荐