阐述了管井井点排水的设计布置及井点钻孔质量、三滤质量、洗井质量、抽水连续性等关键工序的施工技术。
The design layout, key process of construction, such as well point drilling quality, filtrating quality, well washing quality, continuity of pumping were discussed.
本文以泰来县两棵排水闸站厂房基坑排水为例,叙述了轻型井点降水布置、设备的选择及实施过程。
The paper takes the drainage of foundation pit in Liangke drainage gate of Tailai county as the example, introduces the layout of well point, the selection of equipment and the implement process.
应用推荐