FPSO既不同于船,也不同于井口平台。
介绍春晓气田群开发建设项目中春晓井口平台电动消防泵的选型过程。
This paper describes the experience of sizing and performance selecting of electric fire water pump for Chunxiao wellhead platform.
辽海KH - 6三井井口平台为桩基础钢结构平台,基础结构为四腿导管架,通过桩基础固定于海底。
The Sanjing well head platform (KH 6) at the Laihai oil field is a steel structure supported on piles. Its foundations is composed of four guide pipes and driven into the seabed through the piles.
应用推荐