该系统可测试井下温度,压力,流量等参数,以保证采油工作的安全进行。
Parameter, such as temperature, pressure and flux are tested by this system guaranteeing oil extraction worked safely.
通过实验研究了利用模拟瓦斯气体在井下温度和中高压的条件下合成瓦斯水合物。
The paper introduces the formation of imitative gas hydrate at the temperature in main shaft and moderate high pressure.
分析了停产后距井筒径向不同距离上的井下温度场分布及停产时间对温度场分布的影响。
The effects of different distance from wellbore and off production time on downhole temperature distribution are developed.
应用推荐