并计算施工过程中墩顶必须承受的最大水平拉力以及钢纵梁的最大轴向压应力。
The maximum horizontal force that the pier must resist and the longitudinal stress of the stringer are studied.
居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
增加药物溶解度和溶出速率,是齐墩果酸新制剂研究中的主要措施。
One of the most powerful means in the development of oleanolic acid new dosage forms is to increase its solubility and drug dissolution velocity.