检查结构预留孔洞、沟槽及设备基础是否符合要求,发现与设计不符者,应及时提出,并与土建承包商协商处理。
Check the preformed holes, grooves and equipment meeting the requirements or not. If there is any problem, clarify it and settle it with the coordination of the civil engineering contractor.
设计图纸和设计文件表示不明确或有错误及遗漏,图纸与说明书不符;
There are ambiguity, mistakes and omission in design drawing and illustrating file; drawing isn't subject to specification.
不属工程量清单范围内的设计变更;提供的工程地质资料与实际不符而增加工程量影响进度的。
Design alteration isn't in the range of construction work quantity; supplied geological information, which doesn't conform to actual condition, has an influence on construction progress.
应用推荐