利用非耦合的有限单元法分析了三峡工程三期心墙围堰方案中围堰的稳定性和变形情况。
The analysis of stability and deformation of the third stage core cofferdam of the Three Gorge Project is performed by the uncoupled finite element method.
该设计选用了两款合适的嵌入式处理器,在保证系统的性能和低功耗要求的同时,方便了系统的实现。整个设计分为监护控制单元、心电采集单元和除颤单元三个部分。
Two types of suitable embedded MCUs are used, which make the system realization easier, and the requirement of good performance and low power consumption is met as well.
应用推荐