一旦设计定稿,使用传统的方法是:一条产品线将被设置,物料被大量生产和装配。
Once a design was finalised, a production line would be set up and parts would be manufactured and assembled using conventional methods.
一旦已经应用了涂层并已经干燥,就可开始装配。
Once the coating has been applied and has dried, you can begin assembly.
监控开关都是按照所有相关管理机关的要求在工厂进行预置和测试。一旦阀门装配后,就不可能进行调整。
Supervisory switch is preset and tested in accordance with all applicable agency requirements at the factory. No adjustment is possible once the valve is assembled.
应用推荐